Server Liquid Cooling Project Input Checklist

Prepare a server cooling inquiry with the hardware, heat load, chassis space, coolant connections and expected quantity. Use this checklist to organize what is known and highlight details that still need discussion.

Start the Checklist

ThermalBro Engineering Resources · Version 1.2 · Updated: October 17, 2026

ONLINE PROJECT CHECKLIST

Server Module Review

The Minimum Information for an Initial Review

Start with the four groups below. Photos and sketches are useful for an initial discussion; final dimensions and fit require the relevant drawings.

PLATFORM

Server and board

Form factor, height, motherboard and controlled revision.

HEAT SOURCES

Processors and load

CPU/GPU model, quantity, sustained/peak/concurrent workload.

INTERFACES

Chassis and fluid

Available space, routing, connections and external-loop owner.

PROJECT

Testing and timing

Required tests, quantities, project stage and target dates.

Platform, Heat-Source and Chassis Inputs

Accurate platform identification prevents a module from being developed around the wrong board, socket, processor or service space.

  • Server form factor, rack height and complete configuration
  • Motherboard, processor/socket and GPU/PCB revision
  • Heat-source quantity, sustained/peak/concurrent workload
  • Allowed temperatures, ambient and performance objective
  • 3D assembly, 2D interface drawing and keep-out zones
  • Mounting, adjacent components and residual airflow
  • Tube route, bend space, connections and support
  • Installation/removal sequence and required tools
  • Maintenance access and leak-impact area
  • Transport orientation and service procedure

Upload a Server Drawing

Coolant, Connections and External Equipment

For an internal closed-loop module, identify the radiator space, airflow and operating environment. If the module connects to an external loop, include the coolant, inlet temperature, flow and connection requirements below. Mark details that are still to be confirmed.

InputRecordOwner
Coolant and material compatibilityType, concentration/condition and applicable restrictionsCustomer / shared specification
Inlet conditionTemperature range and environmental/condensation boundarySystem owner
Hydraulic conditionTarget flow or pressure range and pressure-drop budgetShared engineering
Connections and routingType, location, orientation and service processDefined interface owner
Pump / radiator / CDU / facilityIncluded, customer-provided or third-partyWritten project boundary
Monitoring and responseSensors, thresholds, actions and system safety ownerCustomer/system owner

Review the D2C Architecture →

Testing, Quantity and Quotation Requirements

State the tests and pass criteria alongside the components, quantities and delivery schedule you need quoted.

Validation fieldDefine
QuestionWhat decision must the test support?
ConditionLoad, duration, environment, coolant, flow and controls
SampleConfiguration, quantity and revision
AcceptanceCriterion, record and disposition owner
  • Prototype, pilot and production quantity
  • Target review, sample and release milestones
  • Customer-provided and supplier-provided items
  • Tooling, reports, labels and packaging
  • NDA, file control and communication route
  • Assumptions, exclusions and change/re-quote rules

Check the Brief Before Sending It

Use 0 for missing information, 1 for partial information and 2 for confirmed information in each group. This measures brief completeness only; feasibility, price and timing still need review.

0–2Platform and heat sources
0–2Chassis and service
0–2Fluid and external boundary
0–2Validation and evidence
0–2Quantity and commercial scope
Can photos replace a 3D model for an initial review?

Photos and layout sketches can support an initial discussion when controlled CAD is not yet available. They cannot establish final dimensions, interference, mounting or release geometry, so controlled files are still required before final design.

How should a server thermal target be stated?

State the real processor configuration and workload, duration, ambient and coolant inlet conditions, flow or pressure condition, controls, measurement points, allowed temperatures and the acceptance rule.

What if rack or facility conditions are not finalized?

Record the current assumptions and identify their owner. ThermalBro can perform an initial module-boundary review, but final flow, heat-rejection and system validation decisions remain open until the external conditions are controlled.

Can an NDA be signed before file transfer?

An NDA can be discussed before confidential platform files or drawings are transferred. The project parties, information covered and permitted use are confirmed in the agreement.

Method sources: Open Compute Project Cold Plate Cooling and approved ThermalBro product records. This checklist prepares inputs; it does not guarantee feasibility, quotation or performance.

Send the Brief for a Server Module Review

Attach the available board and chassis files, describe the cooling arrangement and list your open questions. We can begin with an incomplete brief.

Review My Server Project Brief