Server and board
Form factor, height, motherboard and controlled revision.
Prepare a server cooling inquiry with the hardware, heat load, chassis space, coolant connections and expected quantity. Use this checklist to organize what is known and highlight details that still need discussion.
Start the ChecklistStart with the four groups below. Photos and sketches are useful for an initial discussion; final dimensions and fit require the relevant drawings.
Form factor, height, motherboard and controlled revision.
CPU/GPU model, quantity, sustained/peak/concurrent workload.
Available space, routing, connections and external-loop owner.
Required tests, quantities, project stage and target dates.
Accurate platform identification prevents a module from being developed around the wrong board, socket, processor or service space.
For an internal closed-loop module, identify the radiator space, airflow and operating environment. If the module connects to an external loop, include the coolant, inlet temperature, flow and connection requirements below. Mark details that are still to be confirmed.
| Input | Record | Owner |
|---|---|---|
| Coolant and material compatibility | Type, concentration/condition and applicable restrictions | Customer / shared specification |
| Inlet condition | Temperature range and environmental/condensation boundary | System owner |
| Hydraulic condition | Target flow or pressure range and pressure-drop budget | Shared engineering |
| Connections and routing | Type, location, orientation and service process | Defined interface owner |
| Pump / radiator / CDU / facility | Included, customer-provided or third-party | Written project boundary |
| Monitoring and response | Sensors, thresholds, actions and system safety owner | Customer/system owner |
State the tests and pass criteria alongside the components, quantities and delivery schedule you need quoted.
| Validation field | Define |
|---|---|
| Question | What decision must the test support? |
| Condition | Load, duration, environment, coolant, flow and controls |
| Sample | Configuration, quantity and revision |
| Acceptance | Criterion, record and disposition owner |
Use 0 for missing information, 1 for partial information and 2 for confirmed information in each group. This measures brief completeness only; feasibility, price and timing still need review.
Photos and layout sketches can support an initial discussion when controlled CAD is not yet available. They cannot establish final dimensions, interference, mounting or release geometry, so controlled files are still required before final design.
State the real processor configuration and workload, duration, ambient and coolant inlet conditions, flow or pressure condition, controls, measurement points, allowed temperatures and the acceptance rule.
Record the current assumptions and identify their owner. ThermalBro can perform an initial module-boundary review, but final flow, heat-rejection and system validation decisions remain open until the external conditions are controlled.
An NDA can be discussed before confidential platform files or drawings are transferred. The project parties, information covered and permitted use are confirmed in the agreement.
Method sources: Open Compute Project Cold Plate Cooling and approved ThermalBro product records. This checklist prepares inputs; it does not guarantee feasibility, quotation or performance.
Attach the available board and chassis files, describe the cooling arrangement and list your open questions. We can begin with an incomplete brief.